Transforming a Live Retail Space: Men’s Wearhouse Lakewood TI Project

img 0199

Timeline: 3 Months
Scope: Full Tenant Improvement

At JC&S Facility Management & Construction, we thrive on complex, live environment challenges and the Lakewood Men’s Wearhouse project was exactly that.

Over the course of three months, we executed a full tenant improvement that included:

  • Complete interior demo and framing
  • Full electrical upgrades and trenching
  • New plumbing throughout
  • Installation of 3 rooftop HVAC units with ductwork
  • Drywall and suspended ceiling installation
  • Interior painting and commercial flooring
  • Installation of owner-supplied fixtures

Key Challenges We Overcame:

  • Live Store Operations: Construction occurred while the store remained open. We carefully coordinated crews and phased electrical work to avoid disruptions our experience made all the difference.
  • Fixture Storage Issues: With limited interior space, we resolved this by securing a storage container for incoming fixtures.
  • Unexpected Sewer Blockage: A piece of a sewer snake was stuck deep inside a main line. We located the obstruction, removed it, and restored full flow all while minimizing impact on the construction schedule.

The end result was a seamless transformation delivered with precision and pride. Both our team and the client were extremely pleased with the outcome.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top