Timeline: 3 Months
Scope: Full Tenant Improvement
At JC&S Facility Management & Construction, we thrive on complex, live environment challenges and the Lakewood Men’s Wearhouse project was exactly that.
Over the course of three months, we executed a full tenant improvement that included:
- Complete interior demo and framing
- Full electrical upgrades and trenching
- New plumbing throughout
- Installation of 3 rooftop HVAC units with ductwork
- Drywall and suspended ceiling installation
- Interior painting and commercial flooring
- Installation of owner-supplied fixtures
Key Challenges We Overcame:
- Live Store Operations: Construction occurred while the store remained open. We carefully coordinated crews and phased electrical work to avoid disruptions our experience made all the difference.
- Fixture Storage Issues: With limited interior space, we resolved this by securing a storage container for incoming fixtures.
- Unexpected Sewer Blockage: A piece of a sewer snake was stuck deep inside a main line. We located the obstruction, removed it, and restored full flow all while minimizing impact on the construction schedule.
The end result was a seamless transformation delivered with precision and pride. Both our team and the client were extremely pleased with the outcome.